Class Date Topic HW Problem set
1

08/26

Introduction to Class, Syllabus, Grading, Lab, Expectations

2 08/31 Chapter 3.1 - 3.3 Pipe Friction  
3 09/02 Chapter 3.4 - 3.5 Pipe Friction 3.5.2, 3.5.4, 3.5.5, 3.5.10
  09/07 No Class -> College Closed
4 09/09 Chapter 3.6 - 3.7 Pipe Friction  
5
09/14 Chapter 3.8 - 3.11 Pipe Minor Losses 3.7.9, 3.11.1, 3.11.3, 3.11.10
6 09/16 Chapter 4.1 Pipelines  
7 09/21 Chapter 4.2 - 4.3 Negative Pressure and Pumps 4.1.6; 4.1.14; 4.2.6; 4.2.11
8 09/23 Chapter 4.4 Pipe Networks  
  09/28 No Class -> College Closed  
9 09/29 Chapter 4.4 Pipe Networks Demand => click here for PPTx 4.3.2; 4.4.3
10 09/30 Quizz #1  
11 10/05 Chapter 5.1 - 5.4 Pump Types  
12 10/07 Chapter 5.5 - 5.6 Pumps in Parallel and Series 5.1.5; 5.5.1; 5.5.4; 5.6.3; 5.6.5
  10/12 No Class -> Columbus Day  
13 10/14 Chapter 5.7 - 5.9 Pump Operation 5.9.3; 5.9.4; 5.9.6; 5.10.4; 5.11.2; 5.11.4
14 10/19 Chapter 5.10 Pump Characteristics and dim-less performance  
  10/20 Project Assignment! For more information visit the Project tab
15 10/21 Chapter 6.1 Open Channel Flow: Classification  
16 10/26 Quizz #2  
17 10/28 Chapter 6.2 Uniform Flow 6.2.5; 6.2.7; 6.2.9; 6.3.5; 6.3.7
18 11/02 Chapter 6.3 - 6.4 Cross Sections & Energy Principle  
19 11/04 Chapter 6 Lecture on Froude Number and Critical Flow  
20 11/09 Chapter 6.5 Momentum Principle and Hydraulic Jumps  
21 11/16 Chapter 6.6 & .7 & .8 Gradually Varied Flow  
22 11/18 Chapter 8.5 Hydraulic Structures: Weirs  
23 11/23 Chapter 11.1 Basic Hydrologic Concepts  
  11/25 No Class -> ThanksGiving  
24 11/30

Chapter 11.2 Design Strom

 
25 12/02 Chapter 11.3 Excess Rainfall: SCS Procedure  
26 12/07 Chapter 11.4 Design Runoff: Unit Hydrograph  
27 12/09 Chapter 11.6 Hydraulic Design: Rational Method  
  12/__

Final Exam from _8:30am - 10:00am on BlackBoard

 
       
       
       

 

 


This page was last edited 08/04/20
For comments and suggestions please contact
mpiasecki@ccny.cuny.edu